TOURISM FACILITIES COMPLETED PROJECTS
-
Brazzaville Radisson Blu Mbamou Palace Hotel
Employer : Yüksel Construction |
Location : Brazzaville / Kongo |
Date of Contract : 2014 |
Date of Completion : 2015 |
Closed Area : 25.000 m2 |
Apart from the main building, there are 2-storey indoor car park and ballroom building, SPA building, Paillotte outdoor restaurant and swimming pools in the garden. Within the scope of electromechanical works: • Medium Voltage and Transformer Installations • Low Voltage Installation • Indoor Lighting and Power Installation • Environmental Lighting Installation • Generator and UPS Installation • Data and Telephone System • Fire Alarm and Alarm System • Voiceover Installation • CCTV System, Card Access System • IP TV System, Professional Sound and Light Systems • Earthing and Lightning Protection Facilities • All Plumbing Works • Cooling and Ventilation Facilities • Rain Water Installation • Treatment, Fire Extinguishing Systems • Building Automation Systems.
-
Four Seasons Hotel
Employer: Codest |
Location : Bakü / Azerbaijan |
Date of Contract : 2010 |
Date of Completion : 2013 |
Closed Area : 45.000m2 |
The 5-star hotel offers a total of 179 bedrooms, an indoor swimming pool, a gym, saunas, massage rooms, meeting and ballrooms, bars and restaurants. Within the scope of electromechanical works: • Medium voltage and transformer installations • Low voltage installation • Lighting and Power Distribution • UPS systems • Grounding and lightning protection system • Fire alarm and alarm system • Telephone, CCTV, Audio and Security systems infrastructure • All plumbing works • Heating, cooling and ventilation systems • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Jw Marriot Ankara Hotel
Employer: Özkar Construction |
Location: Ankara / Turkey |
Date of Contract: 2009 |
Date of Completion: 2011 |
Closed Area: 105.000 m2 |
The 5-star hotel offers bedrooms, swimming pools, gyms, meeting rooms, bars and restaurants, as well as rentable offices and shops. Within the scope of electromechanical works: • Medium voltage and transformer installations • Low voltage installation • Indoor lighting and power installation • Data and telephone system • Fire alarm and alarm system • Audio system • CCTV system • Security system • Wiring of mechanical equipment • Grounding and lightning protection installation • UPS systems • All plumbing works • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Sheraton Batumi Hotel
Employer: Nurol Construction |
Location : Batum / Georgia |
Date of Contract : 2008 |
Date of Completion : 2010 |
Closed Area : 26.000 m2 |
The 5-star hotel offers bedrooms, a swimming pool, gyms, bars and restaurants. Mechanical Works: • All plumbing works • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems • Building mechanical automation systems.
-
Çubuklu Valley Houses
Employer: Fiba - Yüksel Construction |
Location: İstanbul - Turkey |
Date of Contract : 2007 |
Date of Completion : 2009 |
Closed Area : 38.500m2 |
It consists of 120 villas with 6 different types of terraces, private garden and pool with a terrace of 220 m2 to 600 m2. There are also sports and social facilities in the valley. Within the scope of Electromechanical Works: • Medium voltage and transformer installations • Low voltage installation • Indoor lighting and force installation • Data and telephone system • Fire alarm and alarm system • Audio equipment installation CCTV system • Security system • Wiring of mechanical equipment • Grounding and lightning protection installation • All plumbing works • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems.
-
Adnan Saygun Art Center
Employer: Öztaş Construction |
Location: İzmir / Turkey |
Date of Contract : 2007 |
Date of Completion: 2008 |
Cloased Area: 26.000 m2 |
There are concert halls, conference, meeting, exhibition halls, restaurant and library on site. • Mechanical works: • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Rixos Grand Ankara Hotel
Employer: Çelikler Construction |
Location: Ankara / Turkey |
Date of Contract: 2006 |
Date of Completion: 2009 |
Closed Area: 60.000 m2 |
There are a total of 215 rooms in the 5-star 5-star hotel on Ataturk Boulevard. Electromechanical works: • Medium voltage and transformer installations • Low voltage installation • Indoor lighting and power installation • Data and telephone system • Fire alarm and alarm system • Audio equipment • CCTV system • Security system • Wiring of mechanical equipment • Grounding and lightning protection • UPS systems • All plumbing works • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Kiev Hyatt Recency Hotel (Stage II)
Employer: Aysel Construction |
Location: Kiev / Ukraine |
Date of Contract: 2004 |
Date of Completion: 2007 |
Closed Area: 35.000m2 |
The hotel also has 233 bedrooms, ballroom, swimming pool, gym, beauty center, meeting rooms, bars and restaurants. Electrical works: • Diesel generator set • LV distribution system • Lighting and power distribution • Grounding and lightning protection system • Fire alarm system • Telephone, CCTV, dubbing and security systems • Ballroom and meeting rooms special sound / music / video systems.
-
Sheraton Ankara Hotel & Towers Convention and Culture Center
Employer: Nurol Construction |
Location: Ankara / Turkey |
Date of Contract: 2004 |
Date of Completion: 2005 |
Closed Area: 36.000 m2 |
Sheraton Ankara Hotel & Towers Congress and Culture Center has 36.000 m2 closed area. The complex has 17 floors and it has an apart hotel, congress center and a shopping center. Mechanical Works; • Heating installation • Ventilation and air-conditioning installation • Fire protection systems • Sanitary installation.
-
Sarigerme-Pegasos Tropical Hotel
Employer: Öztaş Construction |
Location: Muğla / Turkey |
Date of Contract: 2004 |
Date of Completion: 2005 |
Closed Area: 50.000m2 |
Complex consists of D, E, F, G blocks. There are general rooms (shops, restaurants, fast food restaurants, movie theaters), 103 rooms in F block, 200 rooms in Block G and 303 rooms in Block E. In addition, an additional building is constructed for a staff of 6000 m2 with two rooms with 90 rooms. Mechanical works: • All plumbing works • Heating, cooling and ventilation installations • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
NBU Museum
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 2004 |
Date of Completion: 2004 |
Closed Area: 8.000m2 |
There are offices, conferences, meetings, exhibition halls, restaurant and library in its structure. Electrical Installation Works: • LV distribution system • Lighting and power distribution • Grounding and lightning protection system • Fire alarm system • Telephone, CCTV, voice over and security systems are made.
-
Radisson SAS Hotel
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 2002 |
Date of Completion: 2003 |
Closed Area: 12.000 m2 |
The Radisson SAS Hotel has a closed area of 12,000 m2. The 4-star hotel offers 118 rooms, a swimming pool, a gym, ballroom and meeting rooms, bars and restaurants. Scope of electrical installation works: • Diesel generator • LV distribution system • MV switchgear • Lighting and power distribution • Grounding and lightning protection system • Fire alarm system • Telephone, CCTV, SMATV audio and security systems.
-
Le-Meridien Hotels
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 2002 |
Date of Completion: 2003 |
Closed Area: 27.000 m2 |
Le-Meridien Hotel has a closed area of 27.000 m2. The 4 star hotel has bedrooms, swimming pools, gyms, meeting rooms, bars and restaurants. Electrical Installation Works: • Diesel Generator • LV distribution system • Lighting and power distribution • Grounding and lightning protection system • Fire alarm system • Telephone, CCTV, SMATV audio and security systems.
-
Gazprom Institute of Science and Technology
Employer: Yenigün Construction |
Location: Moscow/ Russia |
Date of Contract: 1999 |
Date of Completion: 2001 |
Closed Area: 25.650m2 |
The institute consists of hotel and office departments and the total closed area is 25.650m2. The hotel has a total area of 7600 m2 with a total of 78 rooms, 60 of which are normal and 18 of which are suites. In addition to the complex bedrooms, the lobby, restaurant, bars office rooms, conference hall, private communication center, garage and technical areas are composed. Electrical Works: • Energy distribution • Main and sub panel distribution panels • Lighting fixtures and fittings • UPS system distribution • Fire alarm system • Audio broadcasting system • SMATV • Telephone distribution system and telephone exchange.
-
Tashkent Intercontinental Hotel
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 1995 |
Date of Completion: 1997 |
Closed Area: 42.000 m2 |
Located in the Itec complex, the 5-star hotel is run by the Intercontinental. The hotel, which has all the features of a five-star hotel, has been delivered on a turnkey basis with all of its projects and delivered to the operator. Within the scope of Electrical Works: • Medium voltage systems • Transformers • Low voltage systems • Bus-Bar systems • All lighting and power distribution UPS system including decoration areas • Fire alarm • Telephone, CCTV, SMATV. With the help of building automation systems, all electrical works related to data system and mechanical systems have been carried out except active components.
-
Vatutinki Hotels
Employer: Mensel JV |
Location: Moscow / Russia |
Date of Contract: 1994 |
Date of Completion: 1998 |
Closed Area: 38.000 m2 |
It is a 4 star quality hotel project built in Moscow's summer resort. Within the scope of Electromechanical Works: • All building power distribution and lighting systems • Panel manufacturing and assembly • All weak current systems (fire alarm, telephone, voice broadcast, security SMATV) • Computer controlled building automation works • Conference hall, restaurant special sound and lighting systems • Disco lighting and sound • Environment and facade lighting • Pool lighting • All plumbing works • Conference air conditioners (heating, cooling and ventilation) systems and fancoil installations • Mechanical works of pool, jacuzzi, sauna and fin baths • Fire extinguishing systems (fire pumps, fire cabinets, sprinkler system) • Building mechanical automation systems.
-
Ties Children's Camp
Employer: Mensel JV |
Location: Ties / Russia |
Date of Contract: 1994 |
Date of Completion: 1996 |
Closed Area: 33.000m2 |
The child camp has a closed area of 33.000 m². The camp has dormitories, a restaurant, a cultural center, an indoor swimming pool, a gym and administrative buildings. Within the scope of Electrical Works: • In-house lighting and power installation • Telephone installation • Fire detection and alarm installation • Voice and announcement installation • Security installation • Grounding and lightning protection installation and building automation installation • Transformer substations • Infrastructure installations • External lighting • To beach facilities electrical works.
-
Hyatt Regency Hotel
Employer: Yüksel Construction - Quillery |
Location: İstanbul / Turkey |
Date of Contract: 1992 |
Date of Completion: 1993 |
Closed Area: 48.500 m2 |
The Hyatt Regency Hotel is built by 5 star hotel standards. All electrical works of the hotel were undertaken by our company and were delivered to the administration in 1993. Within the scope of Electrical Works: • MV System • LV distribution system and Bus Bar System • Transformers • Generator system • All lighting and power distribution including decoration areas • UPS system • Fire alarm systems • Telephone, dubbing, CCTV, SMATV • Data systems • Building automation There are all electrical works related to systems and mechanical systems.
-
Hapimag Resort and Hotel Complex
Employer: Yüksel Construction |
Location: Bodrum / Turkey |
Date of Contract: 1991 |
Date of Completion: 1993 |
Closed Area: 75.000 m2 |
The complex has a total construction area of 75.000 sqm with 5-star 500-bed hotel and 700-bed holiday resort, 2 outdoor, 1 indoor swimming pool, tennis courts, disco, Turkish bath, sauna, 4 restaurants, indoor and outdoor parking and sea water. There are sewage treatment plants with treatment. The complex, which was completed in 1993, is at international standards. Within the scope of Electrical Works: • MV Systems • LV distribution system • Transformers • Generator • All lighting and power distribution including decoration areas • UPS system • Fire alarm systems • Telephone, dubbing, CCTV, SMATV • Data Systems • Building automation systems and mechanical systems all electrical works.
-
Ciragan Palace and Hotel
Employer: Yüksel Construction- Çırağan Palace |
Location: İstanbul / Turkey |
Date of Contract: 1989 |
Date of Completion: 1993 |
Closed Area: 35.000m2 |
The hotel is connected to the Çırağan Palace with a service block of 35,000 m2. Electrical works have been successfully completed in accordance with international standards and high quality materials and workmanship and work programs. The construction of the electrical projects in the palace section was included as an additional work in the scope of our commitment and the special sound and light systems in the Çırağan Palace Ballroom, Meeting Rooms and Show Bar were delivered to the administration together with the British Telestage company. Within the scope of Electrical Works: • MV systems • LV systems • Transformers • All lighting and power supply including decoration areas • UPS system • Fire alarm systems • Telephone, CCTV, SMATV • All electrical works related to building mechanical systems were carried out.
-
Bosphorus (Swiss Hotel)
Employer: Anadolu Japan - Hazama Gumi |
Location: İstanbul / Turkey |
Date of Contract: 1989 |
Date of Completion: 1991 |
Closed Area: 95.000 m2 |
All electric works belonging to 5-star hotel with 700 rooms and 1200 beds with 95.000 m2 construction area were directly committed to Hazama Gumi Limited. It was completed at the end of 1991 and delivered to the administration. Within the scope of Electrical Works: • MV systems • LV distribution system • Transformers • Generator plant • All lighting and power distribution including decoration areas (Ballroom and meeting rooms special sound and light installation) • UPS system • Fire alarm systems • Telephone, dubbing, CCTV, SMATV • Data systems • Automatic control, building automation systems.
-
Kemer Marina Building Construction Otem Application Hotel
Employer: Yüksel Construction |
Location: Kemer / Turkey |
Date of Contract: 1984 |
Date of Completion: 1987 |
Closed Area: - |
Within the scope of this work: • Administrative and business buildings, restaurants and shops, housing and workshops • Energy distribution •Llighting works • Projecting material supply and installation of weak current facilities. Approximately 50,000 square meters of navigation areas and roads; • Decorative external lighting works. • Manufacturing and installation of 150 pieces of yachts and yachts. 120-bed capacity 4-star tourist hotel and hotel training center; • Energy distribution Lighting works • Weak current facilities • (4 channel stereo sound system • 3 channel closed circuit TV broadcast system • Fire alarm system Telephone) works, material supply and installation works have been done.