AIRPORT PROJECTS COMPLETED PROJECTS
-
Navoi ATC Building
Employer : Aysel Construction |
Location : ;Navoi / Uzbekistan |
Date of Contract : 2005 |
Date of Completion : 2005 |
Closed Area : 2.200 m2 |
Navoi ATC Tower, built under the new airport project in the city of Navoi, is 36 m high. It has 2 floors and 2200 m2 construction area. Within the scope of Electrical Works: • Diesel generator • A.G Distribution system, • Lighting and power distribution • Grounding and lightning protection system • Fire alarm system • Telephone, TV, security and humidity alarm systems.
-
Khanabad / Karshi Military Airport Lighting Project
Employer : Yüksel-Turkuaz-YDA Construction |
Location : Karshi / Uzbekistan |
Date of Contract : 2004 |
Date of Completion : 2005 |
Closed Area : - |
This project undertaken by Yüksel İnşaat in Uzbekistan-Karshi It is the job of designing and constructing in accordance with security, safety, standards, applicable local standards and other criteria in accordance with the requirements of National Aviation Organization (FAA). All kinds of electrical, HVAC and heaters of the airport runway lighting control building and all technical equipment related to airport lighting and computer equipment, testing, forwarding and training of all systems are within the scope of this work.
-
Kabul International Airport Runway Lighting Project
Employer : Yenigün-Maktaş-Aydeniz JV |
Location : Kabul / Afghanistan |
Date of Contract : 2004 |
Date of Completion : 2005 |
Closed Area : - |
The World Bank Loan and Afghanistan Islamic Transition State have been made as a sub-contractor of the electrical and mechanical installation works for the emergency improvement and other additional works of the Kabul International Airport 11/29 Runway which was awarded by the Ministry of Civil Aviation and Tourism. The construction of the project undertaken by Yenigün-Maktaş-Aydeniz J.V. Within the scope of electrical and mechanical works: • 3500 m. Runway and taxiway lighting system PAPI • Runway and taxiway lighting system • Lighting control center • Pump stations mechanical systems • 2 units 10/0, 4 kV 300 kVA transformer • 2 units 250 kVA There are 2 40 kVA generator plants.
-
Uchkuduk ATC Building
Employer : Aysel Construction |
Location : Uchkuduk / Uzbekistan |
Date of Contract : 2000 |
Date of Completion : 2001 |
Closed Area : 2.200 m2 |
The Uchkuduk ATC building, built as part of the new airport project in Uchkuduk City, is 36 m high. It has 2 floors and 2200 m2 construction area. Electrical Works: • A.G Distribution system • Lighting and power distribution • Grounding and lightning protection system • Fire alarm system • Telephone, TV, security and humidity alarm systems.
-
Uzbekistan 3 Local Airport Modernization Project
Employer : Aysel Construction |
Location : Uzbekistan |
Date of Contract : 1997 |
Date of Completion : 1998 |
Closed Area : - |
Within the scope of this project, the renovation of the runways of the airports in Urgench, Bukhara and Samarkand cities of Uzbekistan and the construction of new terminal buildings, transformer buildings, electrical works and projects of the international terminals and runways within the scope of Shimiz-Mitsubishi-Mitsui have been completed. Electrical Works: • Low voltage systems • Lighting and power distribution systems • UPS system • Fire alarm system • Telephone system • Central Time system • Music and announcement system • CCTV and security systems. With the completion of this project, 3 important cities of Uzbekistan have achieved international air traffic.
-
Adana Airport Prefabricated Terminal Building Construction
Employer : Yüksel Construction |
Location : Adana / Turkey |
Date of Contract : 1996 |
Date of Completion : 1996 |
Closed Area : 10.000 m2 |
In addition to the existing terminal building, the outside facility is used as a terminal building for the Electrical Works: • Low voltage systems • Medium voltage systems • Transformer system • Lighting system • Environmental lighting system • Fire alarm systems • Music and announcement system • Flight information systems • UPS systems .
-
Nefteyugansk Airport Terminal Building
Employer: Mensel JV |
Location : Nefteyugansk / Russia |
Date of Contract : 1994 |
Date of Completion : 1995 |
Closed Area : 6.500 m2 |
The construction of the terminal building began in 1994. It has the most modern flight information system, security closed circuit TV system, satellite TV system, call and public announcement system, central electronic clock system and fire alarm system. In order to ensure that the energy of some of these systems is not interrupted, a central UPS (uninterruptible power supply) has been installed in the building.