INDUSTRIAL FACILITY COMPLETED PROJECTS
-
Space Systems Integration and Test Center
Employer: TR Technology Manufacturing Software |
Location : Ankara / Turkey |
Date of Contract : 2012 |
Date of Completion : 2014 |
Closed Area : 12.000 m² |
The Space Systems Integration and Test Center is designed to serve the environmental testing processes that must be carried out until all the space systems with ground observation, communication and similar features are ready for launch. Electromechanical works: • Medium voltage and transformer installations • Generator • Low voltage installation • Lighting and Power Distribution • UPS systems • Grounding and lightning protection system • Fire alarm and alarm system • Telephone, CCTV, Audio and Security systems infrastructure • All plumbing • Heating, cooling and ventilation systems • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Motorsan Motor Factory
Employer: Abana Motorsan |
Location : Kastamonu / Turkey |
Date of Contract : 2010 |
Date of Completion : 2011 |
Closed Area : 6.000m2 |
Abana Motor Co. The factory that will be used by Electric Motor for production has a total closed area of 7500 m². Within the scope of electrical installation: • Energy supply from MV City network and installation of MV Cell and transformer • High current Energy distribution and Lighting Installation of Busbar System • Building Energy distribution, MCC panels • Indoor lighting and strong current installations • Data Telephone installations • Production Electrical connection of devices • Mechanical and equipment cabling systems.
-
Hacınınoğlu Regulator and HEPP
Employer: Yüksel Construction |
Location : Kahramanmaraş / Turkey |
Date of Contract : 2008 |
Date of Completion : 2011 |
Closed Area : - |
Hacınınoğlu Regulator and HEPP, which is located at the lowest level of Kandil Energy Group Projects, is located in Kahramanmaraş, Upper Ceylan basin in Menzelet Dam mound of Ceyhan River. The regulator is of a similar type with a concrete body and has an installed capacity of 130 MW and an annual energy production of 360 GWh. It also includes the supply and installation of hydromechanical equipment, which includes the 5500m energy tunnel.
-
Köprübaşı Dam and HEPP
Employer: Yüksel Construction |
Location : Bolu - Mengen / Turkey |
Date of Contract : 2007 |
Date of Completion : 2011 |
Closed Area : 11.000 m2 |
The Köprübaşı Dam and HEPP Facilities, which were built by the General Directorate of State Hydraulic Works until a certain stage, are located in Bolu-Mengen region. The project is a Yuksel investment for Yüksel Enerji Elektrik Üretim ve Ticaret A.Ş. for a period of 49 years. Köprübaşı Dam is a clay core rock fill type dam. The installed capacity of the facility is 79 MW and the annual energy production is 203 GWh.
-
Antalya Waste Water Pump Stations
Employer: Yüksel Construction |
Location : Antalya / Turkey |
Date of Contract : 1998 |
Date of Completion : 2000 |
Closed Area : - |
The project consists of two buster wastewater pumping stations in Antalya. The flow rates are 6x95 l / s and 6x135 l / s respectively. It is equipped with stations, grill, odor control units, ultrasonic level measurement system, 6.3 kV cable power line and MV cells, transformer, LV boards, PLC control unit and related accessories.
-
Yuksel Ceramics Factory
Employer: Yüksel Construction |
Location : Söke / Turkey |
Date of Contract : 1998 |
Date of Completion : 1998 |
Closed Area : - |
Yüksel Seramik Inc.'s factory in Aydın / Söke consists of electrical installation, raw material preparation, two production lines and auxiliary facilities. The energy requirement of the factory is provided by 2 2500 kVA transformers and 1 1100 kVA generator. Sasel has provided electromechanical service in the factory where the supply of energy, machinery and pumps is carried out.
-
Tashkent Coca Cola Bottling Factory
Employer: Aysel Construction |
Location : Taşkent / Uzbekistan |
Date of Contract : 1998 |
Date of Completion : 1998 |
Closed Area : 40.000 m2 |
It is a project consisting of administrative building, warehouse, production building and auxiliary facility buildings. The first modern building of Coca-Cola in Uzbekistan was completed in 1998 with all electrical systems and project revisions. The energy requirement of the facility is provided by 5 units 2000kVA transformers and 1 1021kVA generator group. Electrical works include: • MV System • Diesel generator system • LV distribution system • Tali AG distribution system • MCC panels • Production lines, feeds • Lighting and socket system • Emergency lighting system • Road and fence lighting system • Fire alarm system • Grounding and lightning protection system.
-
Noksel Hendek Pipe Factory
Employer: Noksel Steel Pipe |
İşin Yeri : Hendek-Adapazarı / Tukey |
Date of Contract : 1997 |
Date of Completion : 2007 |
Closed Area : - |
The Spiral Welded Pipe Factory of Noksel Steel Pipe Industry Inc., which is located in Hendek, has two lines with a total capacity of 150.000 t / year and the Longitudinal Welded Pipe Factory has six lines with a capacity of 300.000 t / year. There are also social facilities within the boundaries of the facility. At the facility; Induction cooling system, boron oil cooling system, welding gas ventilation system, compressed air installation, 12.700kVA installed power supply line with 5 transformer stations are designed, supplied and assembled.
-
TMO Mersin Silo Project
Employer: TMO - Yüksel Construction |
Location : Mersin / Turkey |
Date of Contract : 1992 |
Date of Completion : 1993 |
Closed Area : - |
15 m wide 273 m long steel piled scaffolding construction for grain loading and unloading operations, sea-to-sea grain 2x600 tons / hour capacity 2x580 m double line belt conveyor and 4x40 m elevators silo transport and existing 600 ton / hour capacity export line conveyors 1200 Upgrades to tons / h. All electricity, low voltage, weak current, automation systems and project works related to the transfer of grain from sea to silo were carried out.
-
Mersin Sewage System Central Pump Station
Employer: Yüksel Construction-Mersin Municipality |
Location : Mersin / Turkey |
Date of Contract : 1992 |
Date of Completion : 1993 |
Closed Area : - |
With the wastewater pumps driven by 4 400 kW, 660 V asynchronous motors, 3 of them are variable speed in the Central Pumping Station, the enkron Sea Discharge Improvement and Central Pumping Station asyon project which is the 1st stage of the Mersin Sewerage and Waste Water Treatment Project A total of 2750 kVA installed power substation has been installed. Thanks to the automation system installed in the pump station and variable speed starters, the flow rate of the facility is equaled to the amount of waste water produced in the city, thus reducing energy use to a minimum and ensuring energy efficiency.
-
Pendik Shipyard Dry Pool Construction
Employer: Yüksel Construction-Ship Industry |
Location : İstanbul / Turkey |
Date of Contract : 1990 |
Date of Completion : 1993 |
Closed Area : - |
300 x 70 m size 8.5m depth of dry pool construction and accumulation of crane roads, berths. This dry pool allows for the construction and docking of vessels with a capacity of 170,000 DXT. Within the scope of the work of Pendik Shipyard Dry Pool Construction , which we undertook at the beginning of 1990 : • Substation • Energy distribution facilities • In and out of the pool area • Earthing works were completed in 1991.
-
154 kV XLPE Cable Work
İşveren : Yüksel Construction-TEK |
Location : İstanbul / Turkey |
Date of Contract : 1989 |
Date of Completion : 1990 |
Closed Area : - |
The supply and installation work of the double circuit 3x (1x1000 mm²) 170 kV XLPE cable installed between Zeytinburnu TM and Veliefendi TM, NKF and Yüksel İnşaat A.Ş. Consortium has been committed to the TEK. The project was carried out by Sasel in 1989. In 1989, the project was completed and the installation works were completed in 1990 and delivered to the TEK.
-
Sinop American Base Power Plant
Employer: Yenigün Construction |
Location: Sinop / Turkey |
Date of Contract: 1988 |
Date of Completion: 1991 |
Closed Area: - |
In the Treatment System and Power Plant Project for sea water supply; renewal of existing power plant, power supply works of treatment systems, project, material supply and assembly have been completed. Within the scope of electromechanical works: • MV System • 5 units 1250 kVA, 4.16kV generator supply and installation • Automatic switching and load sharing of generators • Energy production, distribution and protection systems • Chemical dosing pumps, automation system • Ventilation units, air compressors • Control and instrumentation of control panels for water treatment units with deep well seawater pumps • Process control and instrumentation • Earthing, lightning protection, internal and external lighting works and fire alarm system of the whole project.
-
Mersin Drinking Water Treatment Plant and Buster Pumping Station
Employer: DSİ-Yüksel Construction |
Location: Mersin / Turkey |
Date of Contract: 1988 |
Date of Completion: 1992 |
Closed Area: - |
The first phase of the Mersin Water Treatment Plant was completed in 1984. When the stage is activated, it has reached a capacity of 260.000 m³ / day. In the facility, all electromechanical installation works of ventilation ponds, driers, filters, chemical dosing building and hamsu pumping station were made. After increasing the capacity of the Mersin Water Treatment Plant, it has become necessary to increase the capacity of the Water Transmission Line. Therefore, Buster Pumping Station was built on the line in Karacailyas. In the facility, a 34.5 / 6.3kV transformer center with a total installed capacity of 3.200 kVA was installed with 4x772 l / s pumps driven by an asynchronous motor with 355kW 6.3kV bracelet.