ADMINISTRATIVE AND COMMERCIAL BUILDINGS COMPLETED PROJECTS
-
Femco Tower
Employer: Faisal Electromechanic Comp. |
Location: Dammam / Saudi Arabia |
Date of Contract: 2014 |
Date of Completion: 2019 |
Closed Area: - |
Femco Tower Office and Facality MEP Works
-
Tamimi Market Fal Center
Employer : Tamimi Market Company Ltd. |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2022 |
Date of Completion : 2022 |
Closed Area : - |
Supermarket Total Land Area 2,650 m2, Total building area 2,137 m2. Supply and Install Civil, Steel Construction, HVAC, Fire Fighting, System, Plumbing, Electrical and Mechanical Systems for Internal and External and Exterior Improvement for Core & Shell Scope.
-
Tamimi Market Roshn
Employer : Tamimi Market Company Ltd. |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2022 |
Date of Completion : 2022 |
Closed Area : - |
Supermarket Total Building Area 1000 m2. Supply & Installation; Civil, HVAC, Fire Fighting, Plumbing, Electrical, Mechanical (External), Electrical (External) Systems Complect work.
-
Tamimi Store - Riyadh Diplomatic Quarter
Employer : Tamimi Market |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2021 |
Date of Completion : 2021 |
Closed Area : - |
Total Land Area 3,300 m2, Total building area 2,000 m2. Supermarket & Restaurants. Supply and Install Civil, Steel Construction, HVAC, Fire Fighting, System, Plumbing, Electrical and Mechanical Systems for Internal and External and Exterior Improvement for the Project.
-
DGDA HQ Marketing Extension
Employer : Diriyah Gate Development Authority |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2021 |
Date of Completion : 2022 |
Closed Area : - |
Design and Build Fast Track Turnkey Project. The existing DGDA Headquarter has been built based on modular light-weight contraction methods, The aim is to alight with these contraction methodologies and tie-in seamlessly to the existing building and MEP systems. This level integration will include the Architecture, Structural, ID, MEP, FLS, ELV security and Landscaping requirements to match the current HQ facilities.
-
Girls Campus – Female Faculty Of Dentistry
Employer : Imam Abdulrahman Bin Faisal University |
Location : Dammam / Saudi Arabia |
Date of Contract : 2019 |
Date of Completion : 2019 |
Closed Area : - |
Faculty land on around 7100 m2 with 15.000 m2 construction area. Construction of Building for Faculty of Dentistry, Construction Concrete and wall works, Construction finishing works, Hollow metal doors, windows and frames, Landscape works. Electro-Mechanical works; Air Handing Unit (AHU), Exhaust Fans ( EF ), HVAC works , Fire Fighting works , Power outlet works , Transformer , Ring Main Unit (RMU) , Motor Control Center (MCC) , MDB, Data and Telephone System, IP CCTV System, Low Voltage & Medium Voltage Cables works and BMS System, Conveying system elevators (4 pcs ), Freight Elevator (1 pcs )
-
Currie Brown Office Interior Fit Out And MEP Works
Employer : Diriyah Gate Development Authority (DGDA) |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2020 |
Date of Completion : 2020 |
Closed Area : - |
Interior Design and Electrical & Mechanical Works: Fitout and FF&E
• Supply and Construction of Glass Partitions
• Supply and Construction of Gypsum Wall Partitions & Ceiling Works
• Rehabilitation and Improvement of HVAC System
• Rehabilitation and Improvement of Fire Sprinkler & Fire Alarm System
• Rehabilitation and Improvement of IP Data System
• Rehabilitation and Improvement of CCTV System
• Rehabilitation and Improvement of Access Control System
• Rehabilitation and Improvement of Power Distribution System
• Supply and Assembly of All Office Furnitures
-
World Tourism Organization - UNWTO
Employer : Diriyah Gate Development Authority (DGDA) |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2021 |
Date of Completion : 2021 |
Closed Area : - |
Completion of building and preparation to opening ceremony.
-
Diriyah Gate Development Authority Site Office Project
Employer : Diriyah Gate Development Authority (DGDA) |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2019 |
Date of Completion : 2020 |
Closed Area : - |
Infrastructure and Electrical & Mechanical Works
• 45,000 m2 Asphalt and 37,000 m2 Parking Area
• Underground Storm, Sewage, Potable, Irrigation and Fire Water Network
• Construction of 2-floors Total 12,000 m2 Steel Structure Modular Office Building
• Construction and furnishing of 1 No. Main Guard House
• Supply and Assembly of All Office Furniture’s
• All associated Civil, Architectural and Electro-Mechanical Works
-
King Faisal University Fencing Works From Gate 2 To Electrical Station
Employer : King Faisal University |
Location : Al Ahsa – Hofuf / Saudi Arabia |
Date of Contract : 2014 |
Date of Completion: 2015 |
Closed Area : - |
The Project consist of removing and reconstruction of approximately 900m boundry wall around the university and also include demolishment of all security gates and reconstruction of new gates with related infrastructure, MEP and civil works.
-
Şahdağ Winter-Summer Tourism Complex
Employer : Yenigün |
Location : Quasar / Azerbaycan |
Contract of Date : 2014 |
Project Duration : - |
Closed Area : - |
Main Plaza, which is located between the hotels, shops, restaurants, bar, billiard room, cinema, information office, ice rink and 2 4010 m2 parking lot, consists of warehouses and technical places. Power stations and terminal buildings are located in various regions within the tourism complex. Electrical and mechanical systems in common areas and technical spaces are covered by turnkey contract. • Heating - Cooling - Ventilation - Air conditioning system • Rain Drainage system • Sanitary installation system • automatic fire extinguishing system • Building automation system • Smoke evacuation and pressurization system • Medium voltage and transformer installations • Low voltage installation • Lighting and Power Distribution System • Data and Telephone System • Fire Alarm and Alarm System • Announcement System • CCTV System • Grounding and Lightning Protection System • Uninterruptible Power Systems • CO detection system is covered.
-
Abu Bakr Siddiq Road Phase 2 Stretch 1
Employer : Ar Riyadh Development Authority |
Location : Riyadh / Saudi Arabia |
Date of Contract : 2014 |
Date of Completion: 2018 |
Closed Area : - |
Abu Bakr As Siddique Road Development Project, Electromechanics including Riyadh, King Abdullah Road and Prince Salman Road at the junction of Prince Salman Road. systems and construction infrastructure works. Within the scope of Electromechanics and Construction Works: • Lighting Poles for bridge, overpasses and road lighting system, • Visual Led Lighting System, • Led Lighting Fixtures, • Pavilion Type Package Transformer, • Energy Distribution System Panels; • Lift installation for overpasses; • Green Area Irrigation System electrical installation, 450 m³ / day capacity Reverse Reverse Water Treatment Plant (Reverse Osmosis), • Sanitary Installation and • Ventilation System (AHU); • Within the scope of Intelligent Traffic Management System, • Gantry, • Mast, • Camera, • Real Time Warning Message Boards and • Control Center are the systems and main pen equipment that can be listed.
-
Almaz Shopping Center
Employer: Yenigün Construction |
Location: Chelyabinsk / Russia |
Date of Contract: 2014 |
Date of Completion: 2015 |
Closed Area: 213.410m² |
There are various sized shops, fast food restaurants, cinema halls, offices and warehouses in the shopping center. Electrical works: • Medium voltage and transformer installations • Low voltage installation • Lighting and Power Distribution • UPS systems • Grounding and Lightning protection system • Telephone, CCTV, SMATV, Voice Over and Security systems • Customer Calculation System • Radio Communication System • Automation systems .
-
Qabala Prime Ministry Palace
Employer: Dia Holding |
Location: Qabala / Azerbaijan |
Date of Contract: 2013 |
Date of Completion: 2014 |
Closed Area:12.000m² |
The new presidential palace of the Republic of Azerbaijan in Gebele is a building complex. Presidential palace, residence building, staff and police building are also covered. Mechanical works: All plumbing works • Heating, cooling and ventilation facilities • Fancoil installation • Fire extinguishing systems • Building Automation Systems.
-
COC Coalition Operation Center
Employer: Yüksel Construction |
Location: Bagram / Afghanistan |
Date of Contract: 2012 |
Date of Completion: 2014 |
Closed Area: 11.000 m2 |
All electrical works of the administrative building established on an area of 11.000 m² will be used for command and control purposes by the coalition forces within the Bagram Military Base in Afghanistan. Within the scope of the project: The building energy is supplied from 1 2500 kVA and 1 225 kVA Pad Mounted Transformer. 2 units of 1750 kVA generator and synchronization system were installed as spare power. Within the scope of building electrical works: • Grounding • Lightning protection • Data phone (Spirnet, Niprnet, Centrix Data • Fire alarm and warning announcement • Mass Notication systems • All strong current and DDC systems are installed.
-
Taurus Shopping Center
Employer: Taurus |
Location: Ankara / Turkey |
Date of Contract: 2012 |
Date of Completion: 2013 |
Closed Area: 144.000 m² |
There are various sized shops, fast food restaurants, cinema halls, offices and warehouses in the shopping center. Electromechanical works: • Medium voltage and transformer installations • Low voltage installation • Lighting and Power Distribution • UPS systems • Grounding and lightning protection system • Telephone, CCTV, SMATV, Sound and Security systems • All plumbing works • Heating, Cooling and Ventilation Facilities • Fancoil Installation • Fire Fighting Systems • Building Automation Systems.
-
Port Baku Residence
Employer: Pasha Construction |
Location: Baku / Azerbaijan |
Date of Contract: 2011 |
Date of Completion: 2014 |
Closed Area: 375.000m² |
Port Baku Residence project consists of high quality, high technology housing and retail units. With its 2,000 m2 car parking areas and a total construction area of 375,000 m2, the sports hall, wellness complex and multi-purpose meeting room are open 24 hours a day with security. The complex consists of 3 towers with 32 floors. Electromechanical works: • LV distribution systems • Lighting and power distribution • Lighting automation • Fire alarm system • Phone and Data, CCTV, SMATV, voice alarm system • Card access • Billing System • Vehicle Parking Management • CO System • All plumbing • Heating , refrigeration and air conditioning systems • Fancoil installation • Water source heat pump installation • Fire extinguishing systems • Building automation systems.
-
Esentai Mall Shopping Center
Employer: Yüksel-Turkuaz-YDA Construction |
Location: Almaty / Kazakhstan |
Date of Contract: 2011 |
Date of Completion: 2012 |
Closed Area: 110.000 m² |
The shopping center has 674 parking spaces in the cinemas, dining area, sports center, shops and basement floor. All electrical and mechanical systems in common areas and technical spaces are covered by turnkey contract. Electromechanical works: • Heating-Cooling-Ventilation-Air-conditioning system • Rain Drainage system • Sanitary installation system • Automatic fire extinguishing system • Building automation system • Smoke evacuation and stair pressurization system • Medium voltage and transformer installations • Low voltage installation, • Building Indoor Lighting and Power Distribution System • Data and Telephone System • Fire Alarm and Alarm System • Announcement System • CCTV System Infrastructure • Grounding and Lightning Protection System • Uninterruptible Power Supply Systems • CO detection system is covered.
-
Bagram American Above Administrative Building
Employer: Yüksel Construction |
Location: Bagram / Afghanistan |
Date of Contract: 2012 |
Date of Completion: 2014 |
Closed Area: 2.200 m2 |
All electrical works of the administrative building established on an area of 2,200 m² will be used for the purpose of Command and Control of American military forces within the Bagram Military Base in Afghanistan. Within the scope of the project, the energy of the building is provided with 1 1,500 kVA Pad Mounted Transformer. The supply of critical loads in the building is done by 1 100 kVA UPS and there is also 1 250 kVA generator. Building electrical works: • Grounding • Lightning protection • Data telephone, (Spirnet, Niprnet, Centrix Data and Voice) • Fire Alarm, • Mass Notication • ESS (Electronic Securty System) • Public Address • DDC systems are installed.
-
Troop House Project
Employer: Yüksel Construction |
Location: Bagram / Afghanistan |
Date of Contract: 2011 |
Date of Completion: 2014 |
Closed Area: 44.800m2 |
In order to meet the sheltering needs of American Soldiers within the Bagram Military base, the building consists of 28 buildings, each of which is 1600m². Within the scope of the project, 1 1500 kVA, 3 1000 kVA, 1 750 kVA, 3 500 kVA and 1 300 kVA Pad Mounted Transformer were used. Electrical works: • Grounding of buildings • Lightning protection • Strong current • Data telephone • Fire Alarm • Mass Notification systems are installed.
-
Zorlu Center Mall
Employer: Aktürk Construction |
Location: İstanbul / Turkey |
Date of Contract: 2010 |
Date of Completion: 2016 |
Closed Area: 310.000 m² |
The Zorlu Center complex has been awarded as 4 phases and 3 phases have been completed under the obligation of our company. 586 residences (160,000 m²), Ruffels hotel and Branded residance (80,000 m²), Cultural center 55,000m². Scope of electrical works: • The construction of Low Voltage, Medium Voltage and Weak Current systems of this complex project has been completed and delivered.
-
Turkish Embassy in Doha
Employer: Yüksel Construction |
Location: Daho / Qatar |
Date of Contract: 2011 |
Date of Completion: 2013 |
Closed Area: 7.300 m2 |
The Turkish Embassy Project in Doha covers 7.300 m2 of enclosed area, including Kestel House Building, Ambassador Residence Building, Constuction Base, Transformer and Generator Buildings, Security Doors, Swimming Pool, Shower and Locker Area Buildings. Within the scope of Electromechanical Works: • Medium voltage and Transformer installations • Low Voltage Installation • Lighting and Power Distribution • UPS Systems • Grounding and Lightning Protection System • Fire alarm and alarm system • Telephone, Data, CCTV, Security and Public Address Systems • Card Pass Systems • All plumbing works • Heating, Cooling and Ventilation Facilities • Fancoil Installation • Fire Extinguishing Systems • Building Automation Systems.
-
Al-Fateh University (Faculty of Economics and Law)
Employer: Nurol Construction |
Location: Tripoli / Libya |
Date of Contract: 2008 |
Date of Completion: - |
Closed Area: 43.500m² |
Buildings of the Faculty of Economics and Law have a total closed area of 43.500 m2. Within the scope of Mechanical Works: • All plumbing works • Heating, cooling and ventilation installations • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Al-Fateh University (Faculty of Agriculture, Veterinary Science and Science
Employer: Yüksel Construction |
Location: Tripoli / Libya |
Date of Contract: 2008 |
Date of Completion : - |
Closed Area: 66.000 m2 |
The Faculty of Agriculture consists of the buildings of the Faculty of Veterinary and Science. The faculty buildings have a total closed area of 66.000 m2. Within the scope of Electrical Works: • Indoor lighting and force installation • Data and telephone system • Fire alarm and alarm system • Audio equipment • CCTV system • Security system • Wiring of mechanical equipment • Transformers • Generators • Earthing and lightning protection installation.
-
Malysheva Alatir Shopping Mall
Employer: Yenigün Construction |
Location: Ekaterinburg / Russia |
Date of Contract: 2008 |
Date of Completion: 2011 |
Closed Area: 79.000 m2 |
Maliseva Sidmoye Shopping Center has 79.000 m2 closed area. It has 11 floors. The complex has a variety of offices, shops, restaurants, fast food restaurants and movie theaters. Electrical works: • LV distribution systems • Lighting and power distribution systems • Fire alarm systems • Telephone, data, CCTV, SMATV, audio systems • Security systems.
-
ATO Exhibition and Conference Center
Employer: ATO |
Location: Ankara / Turkey |
Date of Contract: 2007 |
Date of Completion: 2009 |
Closed Area: 85.000m2 |
Turkey is the largest Europe's 2nd largest convention building. Electrical works: • Indoor lighting and power installation • Data and telephone system • Fire alarm and alarm system • Audio system • CCTV system • Security system • Wiring of mechanical equipment • Grounding and lightning protection installation • UPS systems.
-
Almaty Financial Center
Employer: YTY Consortium |
Location: Almaty / Kazakhstan |
Date of Contract: 2006 |
Date of Completion: 2009 |
Closed Area: 160.000 m2 |
The business center has a closed area of 160.000 m2. A, B, C, D consists of a total of 4 blocks. With in the scope of Electromechanical Works: • LV-MV distribution system • Indoor lighting and power installation • Generator and UPS installation • Front lighting • Data and telephone system • Fire alarm and alarm system • Audio system • CCTV system • Security system, • Wiring of mechanical equipment • Grounding and lightning protection installation • Snow melting systems • All plumbing works • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Jordan General Staff Complex
Employer: Aysel Construction |
Location: Amman / Jordan |
Date of Contract: 2005 |
Date of Completion: 2005 |
Closed Area: 112.000 m2 |
Within the scope of the complex, there are also office areas, social activity areas and management unit areas. Within the scope of electrical works: • Five transformer centers • Seven diesel generator sets with varying power from 800-1675 kVA • MV switchgear plant and distribution system • LV distribution system, • Underground station EMP system, • UPS systems, building lighting and power distribution systems, environmental lighting, • Raised underfloor channel system • Grounding and lightning protection systems • Fire alarm, security, CCTV, TV, data / telephone, X-ray systems project coordination, energy supply, pipe and pan infrastructure works • Helicopter runway lightings • Car safety barrier systems, LCD scoreboard and central clock system.
-
Michurinsky Festival Shopping Center
Employer: Summa |
Location: Moscow/ Russia |
Date of Contract: 2004 |
Date of Completion: 2005 |
Closed Area: 62.000m2 |
Michurinsky Shopping Center has a closed area of 62.000 m2. The complex has shops of various sizes, restaurants, fast food restaurants, movie theaters. Electromechanical works scope: • LV distribution system • Lighting and power distribution systems • Fire alarm systems • Telephone, SMATV, sound systems • Environmental lighting • All plumbing works • Heating, cooling and ventilation installation • Fancoil installation • Fire extinguishing systems • Building automation systems.
-
Embassy of Canada
Employer: Aysel Construction |
Location: Ankara / Turkey |
Date of Contract: 2004 |
Date of Completion: 2004 |
Closed Area: 5.200 m2 |
The Canadian Embassy Building has a covered area of 5.200 m2. Electrical works: • Generator and voltage regulator system • LV distribution system • Lighting and power distribution • Central lighting control • Busbar power distribution system • EMT piping • Grounding and lightning protection system • Data and telephone system • Fire alarm systems • CCTV and card access control system • Security systems • TV distribution system.
-
MHP Headquarters Building
Employer: Aysel Construction |
Location: Ankara / Turkey |
Date of Contract: 2002 |
Date of Completion: 2004 |
Closed Area: 27.000 m2 |
MHP Headquarters building has 27.000 m2 closed area. The building has headquarters, R & D department, 750-person conference hall, meeting rooms, library, kitchen and cafeterias, dining hall and helipad on top of the tower block. Within the scope of Electrical Works : • MV systems • LV distribution system • Lighting and power distribution • Lighting automation • Grounding and lightning protection system • Fire alarm system • Broadcasting system • Telephone, CCTV, SMATV, call, clock and security systems.
-
SPK-IMKB Building
Employer: Oyak Construction |
Location: Ankara / Turkey |
Date of Contract: 2002 |
Date of Completion: 2003 |
Closed Area: 22.000m2 |
SPK a IMKB Building has 22.000m2 closed area. Electromechanical works: • LV-MV distribution systems • Disinfection and power distribution • Fire alarm system • Telephone, CCTV and sound systems, • All plumbing works • Heating, cooling and ventilation systems • Fancoil installation • Fire extinguishing systems • Building automation systems .
-
Eurocentrum Business Center
Employer: Yenigün Construction |
Location: Warsaw/ Poland |
Date of Contract: 2001 |
Date of Completion : 2002 |
Closed Area: 38.000 m2 |
This complex is built on 38.000 m2 closed area and consists of 4 high quality office buildings. The Alpha Building has been completed as the first building of the Eurocentrum complex, which consists of A class rental offices. Within the scope of the project: • Electrical installation work • One main medium voltage room and 2x1600 kVA transformer room • Low voltage distribution room and 630 kVA generator room weak current installation • Building management systems • Security systems • Car parking systems • All internal and external lighting systems. • Underground parking with 3 floors each with 9950 m2 • 21.950 m2 rental area on 21 floors.
-
Metrocity Complex
Employer: Yüksel Construction Investment |
Location: İstanbul / Turkey |
Date of Contract: 2000 |
Date of Completion: 2003 |
Closed Area: 215.000 m2 |
Metrocity Complex, located on the Zincirlikuyu Maslak Line, which is the financial and commercial center of Istanbul, has a total area of 215,000 m2. There are 2 residential buildings, 24-storey Office Tower, Shopping Center and Social Facilities. All electrical installations are covered.
-
Itec Business Center
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 1998 |
Date of Completion: 2000 |
Closed Area: 62.000m2 |
Itec complex is the largest building with a construction area of 62,000 m2. 16 floor business center on 3 floors basement was made as turnkey. Within the scope of Electrical Works : • MV System • Diesel generator system • LV distribution system • Busbar distribution system • MCC panels • Lighting and socket system • Emergency lighting system • Telephone system • Fire alarm system • Music and announcement system • CCTV system • SMATV system Grounding and lightning protection system.
-
Supreme Court Building
Employer: Urban Construction |
Location: Moscow/ Russia |
Date of Contract: 1999 |
Date of Completion: 2000 |
Kapalı Alan : 32.000 m2 |
Office areas, 8 small, 2 large court rooms, 2 dining rooms, kitchen, archives and technical service rooms, as well as door garage, nuclear security and technical rooms where 3 service blocks and 16 luxury rooms, general use and a hotel block consisting of 1 hotel block consisting of service spaces. Within the scope of Electrical Works: • Energy distribution • Lighting installation • Panel assemblies • Automation systems.
-
Ramstore Shopping Center
Employer: Aysel Construction |
Location: Almaty / Kazakhstan |
Date of Contract: 1998 |
Date of Completion: 1999 |
Closed Area: 26.000 m2 |
Ramstore, built in Almaty, Kazakhstan, has an area of 26.000 m2 and has 54 shops and a Migros shopping center. The construction of Low Voltage, Medium Voltage and Low Current systems of this complex project has been completed and delivered. Electrical Works: • MV System, • Diesel generator system, • LV distribution system, • MCC panels, • Lighting and socket system, • Ice skating rink lighting system, • Telephone system, • Fire alarm system • Music and announcement system, • Security system, • CCTV system, • SMATV system, • Grounding and lightning protection system.
-
Itec Shopping Center
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 1998 |
Date of Completion: 1999 |
Closed Area: 8.500m2 |
The shopping center, which has an area of 8.500m2, is located in the ltec Complex in Taþkent. All electrical works of the building which has fast food restaurants, administrative offices, buffets and warehouses of various sizes were delivered in 1999. Electrical works: • MV System • Diesel generator system • LV distribution system, • Shop boards • MCC panels • Lighting and socket system • Emergency lighting system, • Telephone system, • Fire alarm system • Music and announcement system • CCTV system • SMATV system, • Grounding and lightning protection system.
-
Central Bank of Uzbekistan Headquarters Building
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 1997 |
Date of Completion: 1998 |
Closed Area: 30.000 m2 |
This complex is built on 38.000 m2 closed area and consists of 4 high quality office buildings. The Alpha Building has been completed as the first building of the Eurocentrum complex, which consists of A class rental offices. Within the scope of the project: • Electrical installation work • One main medium voltage room and 2x1600 kVA transformer room • Low voltage distribution room and 630 kVA generator room weak current installation • Building management systems • Security systems • Car parking systems • All internal and external lighting systems. • Underground parking with 3 floors each with 9950 m2 • 21.950 m2 rental area on 21 floors.
-
Branches of the Central Bank of Uzbekistan
Employer: Aysel Construction |
Location: Tashkent / Uzbekistan |
Date of Contract: 1997 |
Date of Completion: 1998 |
Closed Area: 15.000 m2 |
All projects and electrical installations of 4 NBU bank branches in Tashkent city were completed successfully and delivered to the operator. Branches with a total area of 15.000 m2; • Medium voltage systems • Transformers • Low voltage systems • Panel and distribution systems • All lighting (including decoration areas) • UPS system, • Fire alarm • Telephone, CCTV, SMATV and security systems are completed. All systems were designed and installed by us and delivered to the administration.
-
Mesa Headquarters Building
Employer: Mesa |
Location: Ankara / Turkey |
Date of Contract: 1997 |
Date of Completion: 1999 |
Closed Area: 25.000m2 |
Mesa Headquarters Building has a closed area of 25.000 m2. The building has head office, conference hall, meeting rooms, library and cafeterias. Within the scope of Electrical Works : • LV distribution system, • Lighting and power distribution, • Grounding and lightning protection system, • Fire alarm system, • Telephone, Data, CCTV, SMATV, voice over, security systems.
-
Keystone Complex
Employer: Turan Construction |
Location: Moscow/Russia |
Date of Contract: 1995 |
Date of Completion: 1996 |
Closed Area:16.000 m2 |
In addition to the data system in the bank building, a modern-day bank has been built with fire alarm, CCTV system, UPS system, modern telephone system and most importantly special burglar alarm systems. The residential and business center buildings are adjacent to each other with an architecture that forms the kontrol L olup shape and has an automatic controllable garage floor. It was decided to build an office by replacing the part previously built as a residence. The building has a burglar and security system and is also supported by a video doorphone system. In the building, SMATV system and telephone, fire alarm system were added and very modern offices were created.
-
Nefteyugansk Cultural Center
Employer: Mensel JV |
Location: Nefteyugansk / Russia |
Date of Contract: 1993 |
Date of Completion: 1994 |
Closed Area: 17.000 m2 |
Nefteyugansk is an oil city in the north of Russia. One of the biggest buildings of this city is the Cultural Center Complex. It was designed by Russian engineers and some changes have been made to make it a modern building suitable for the conditions of the day. The Cultural Center is a multi-purpose building with a theater hall of about 17,000 square meters and 800 people. The building has large halls that include meeting rooms, theater, costumes and decorations, and music and theater classes for the new generation enthusiast. The building is made up of the most modern telephony, stage sound and lighting system as well as central clock, music broadcast, fire alarm and security system and central television system.
-
Istanbul World Trade Center and Exhibition Facilities
Employer: Yüksel Construction |
Location: Ankara / Turkey |
Date of Contract: 1989 |
Date of Completion: 1990 |
Closed Area: 14.000m2 |
Fixture, which started in 1993, the Istanbul World Trade Center and Exhibition Facilities is Turkey's largest trade fair center. The total closed area is 24.000 m2. Electrical works include: • LV and MV switchgear, • Transformer, • Generator center, • LV distribution system, • Special lighting system, • Outdoor lighting system, • Motor control center, • Telephone exchange and installation, • Fire alarm system; special type fire alarm system for high ceilings. In addition, vocalization works have been delivered.
-
Şekerbank Headquarters Building
Employer: Yüksel Construction |
Location: Ankara / Turkey |
Date of Contract: 1989 |
Date of Completion: 1990 |
Closed Area: 14.000 m2 |
The building, which is built on a 14.000m2 construction site in front of the Grand National Assembly of Ankara on 13 floors, has all units of the General Directorate and the Capital Branch and the exhibition hall. The building was an exemplary structure in which the electrical installation was applied in contemporary dimensions. Electrical works: • Medium voltage systems • Low voltage distribution system • All lighting including decoration areas • Transformers • Generator, • MCC and HVAC automation system • TV, telephone, music and security systems • Environment and facade lighting.
-
TRT Authority Headquarters Facilities
Employer: TRT |
Location: Ankara / Türkiye |
Date of Contract: 1986 |
Date of Completion: 1993 |
Closed Area: 159.984 m2 |
Electrical Works commenced in 1985. 1.Etap Structures in the Complex: • General Directorate • Technical services (heat power plant, business building, printing house etc.) • Nursery, medico social facilities • Warehouses. 2. Stage Structures; • Archive bookshelf • Research - manufacturing • External publications • Educational building, Phase 3 Structures; • Public broadcasting vehicles • Radio studios • TV studios. The infrastructure of the complex, which collects all of these facilities, has been considered in a separate scope.