Russian Federation SKB Presidency Hospital

EMPLOYER : URBAN İNŞAAT A.Ş.
LOCATION : MOSCOW / RUSSIA
CONTRACT DATE : 1997
COMPLATION DATE : 1998
CLOSED AREA : 17.000 m2 / 49.500 m2
Under the renovation of the Presidency hospital main building, composed of Blocks A, B and C, we complited the electric works of Block C and the mechanical works of Blocks A, B and C, (17.000m2) the operation block and the kitchen building. The whole of the hospital comprises 49,500 m2.
The electrical works included:
• Power distribution and panels
• Lighting
• Under floor trunking systems
• Weak current systems
• Telephone
• Fire alarm
• Intercom system
• Public address system
• Nurse call system
• Central clock system
• SMATV system
• Security system
• UPS system which were carried out and handed ower on a turnkey delivery basis.
The mechanical works included:
• Dismantling of the old equipment
• Temporary heating equipment to enable work during the winter
• Bypass lines; Clean and waste water piping of all patient rooms
• Installation of vitrified and chromated materials, installation of heating equipment and radiators; Airconditioning and climatisation equipment
• Hygienic systems
• Smoke discharge systems
• Fire protection systems
• Rainwater drainage systems
• Piping works of the central hot water galleries.