National Bank of Uzbekistan Head Office Building

EMPLOYER : AYSEL İNŞAAT A.Ş.
LOCATION : TASHKENT / UZBEKISTAN
CONTRACT DATE : 1997
COMPLATION DATE : 1998
CLOSED AREA : 30.000 m2
This is a 30,000 m2 project with 3 basemens and 22 floors within the Itec complex. The building was handed over at the end of 1997 and went into operation in early 1998.
The scope of work includes:
• Medium voltage systems
• Transformers
• Low voltage systems
• Busbar systems
• All lighting and power distribution
• UPS system
• Fire alarm
• Telephone, CCTV, SMATV systems as well as a state-af the-art complete security and access control with more than 100 cameras and with a capacity of 2000 cards. The whole system was designed by Sasel.