Sinop American Base Power Station

EMPLOYER : YÜKSEL İNŞAAT A.Ş.
LOCATION : SİNOP / TÜRKİYE
SÖZLEŞME TARİHİ : 1988
COMPLATION DATE : 1991
CLOSED AREA : -
Under the project, water treatment system from sea water and necessary power station work were executed as Design Build base including renewal of existing power plant.
The scope of the work included:
• The supply and installation of five 1250 kVA, 4.16 kV generators
• the automatic activation and load sharing works of the generators
• The power generation and distribution and protection system
• The chemical dosage pumps, the automation system
• Airconditioning units, air compressors
• The installation of local control panels and control centres for the water treatment units and deep well sea water pumps
• Process control and instrumentation
• The installation of the earthing, lightning protection, internal and external lighting works and the fire warning system for the whole project.